Friday, July 11, 2014

Waiting on Shirts and Shipping (Fri, 7/11)

Spent most of the first half of the day trying to co-ordinate the vote on our t-shirt design. Between tracking who had and hadn't voted, and additional designs that I hadn't seen for one reason or another, the process was far more complicated than it had to be. Helped Jimmy figure out a problem he was having with the Prototype, and between our two versions, we should be able to move forward with the project as soon as all of the parts have arrived. As far as I know, we are only really waiting for the suitcase itself to come in. After lunch, Jimmy, David, Abraham, and I went to visit Adam in his lab. He showed us the php script he had been working on to generate random math questions. I answered the question and broke the program within 5 seconds of touching it. After we left, he discovered that he had been using an old version of the script, so it worked again. For the afternoon, we worked on making some small tweaks to the Prototype, as well as trying to come up with an actual name for it. The best results were either the Educational Solar Projection Navigator (ESPN), or the Solar Universal Navigator (SUN). I also made a new KMZ file of another wavelength to be used with the DSE.

No comments:

Post a Comment